Investigate borehole and monitoring well installation, Cone-Penetrometer-Testing (CPT) and Membrane Interface Probe (MIP) surveys to characterize nature and extent of VOCs.
SDG Impact: SDG 9: Industry, Innovation and Infrastructure
Oversee comprehensive waste management programs at multiple locations for aerospace firm.
Provide regulatory and technical consulting services to evaluate presence of PFAS chemicals on airport property.
Complete pilot testing and develop Remedial Action Plan (RAP) specifying use of combination air sparging and soil vapor extraction system to treat petroleum hydrocarbon plume.
Perform system-wide evaluation of secondary containment structures and develop three-part program to improve containment and achieve compliance with SPCC regulations for Class I railroad.
Conduct intensive field survey and prepare Cultural and Paleontological Resources Reports for solar farm project.
Conduct CEQA-compliant Phase I Cultural Resources Assessment (PI-CRA) with potential to be impacted by construction.
Prepare IS/MND for proposed renovations at materials recovery facility including partial demolition and renovation of existing space,
Provide technical monitoring and survey services to secure CEQA clearance during construction.
Prepare EIR and associated CEQA filing and distribution notices for residential and business park development.